Runway Renovation at Atlanta Airport

Overview

A major aviation infrastructure hub undertook an extensive runway renovation as part of a long-term modernization initiative. Maintaining operational efficiency during construction was critical, as the facility supports continuous, high-volume transportation activity.

The project required the removal and replacement of an existing runway surface under an aggressive timeline, while ensuring uninterrupted material availability for round-the-clock construction operations. To support this effort, a reliable and high-capacity bulk material handling solution was essential. Cyclonaire was selected to design and supply the pneumatic conveying and unloading systems needed to keep the renovation on schedule.

Challenges

The runway reconstruction project presented several demanding challenges:

  • An accelerated construction schedule with no tolerance for material delays
  • Continuous operations requiring a steady flow of cementitious materials
  • High-volume handling of abrasive powdered materials
  • The need for on-site storage capable of supporting nonstop production
  • Long conveying distances between storage and batch operations
  • Frequent deliveries from both trucks and railcars
  • A requirement for automated, low-maintenance systems to reduce labor demands

Any disruption in unloading or conveying could have caused delays with significant downstream operational impacts.

Solutions

Cyclonaire engineered a high-capacity pneumatic conveying system tailored for fast-track infrastructure construction.

Key elements of the solution included:

  • Semi-dense phase pneumatic conveyors designed for abrasive, fluidizable materials
  • Vacuum-loaded pressure conveying to reduce wear and material degradation
  • Multiple unloading-assist systems to efficiently unload trucks and railcars away from storage areas
  • Large-diameter conveying lines to improve throughput without modifying delivery vehicles
  • Automated system controls enabling continuous operation with minimal supervision
  • A configuration that allowed materials to be drawn from multiple storage sources for operational flexibility

The integrated system provided a dependable link between material delivery, storage, and batching operations.

Results

The Cyclonaire solution delivered strong operational benefits throughout the renovation project:

  • Consistent and reliable material flow supporting continuous construction activity
  • Faster and more efficient unloading of bulk deliveries
  • Reduced equipment wear when handling abrasive materials
  • Lower labor involvement through automation
  • Improved operational reliability during peak construction periods
  • Successful completion of the runway renovation within the required timeframe

By eliminating material handling bottlenecks, the pneumatic conveying system played a key role in keeping a complex runway renovation project on schedule.